Skip to [main navigation | secondary navigation | content]
Cymraeg


 

BP05 - Housing Land Availability Study

This is the annual Joint Housing Land Availability Study Report for Conwy County Borough.

This is the annual Joint Housing Land Availability Study Report for Conwy County Borough and is produced under Planning Policy Wales (PPW), issued in March 2002.

The current report presents the findings for the area at a base date of 1 April 2009. The report has been prepared by a study group in accordance with the advice contained in Planning Policy Wales (2002) as amended in respect of the Housing Chapter by updated guidance issued through the Ministerial Interim Planning Policy Statement on Housing (MIPPS) 01/2006, and the revised Technical Advice Note (TAN) 1: Joint Housing Land Availability Studies (2006). The studies are carried out on an annual basis and the current report replaces the previous 2008 report for the County Borough.


Related documents

Acrobat/PDF File***Revised August 2012*** BP05 Housing Land Availability Study
Document type: Acrobat/PDF File
Document size: 2.71Mb

Acrobat/PDF FileBP05 - Housing Land Availability Study
Document type: Acrobat/PDF File
Document size: 10.6Mb

Published: 10/03/2011    Last updated: 04/09/2012
 

Strategic Planning and Communities, Regulatory Services, PO Box 1, Conwy, LL30 9GN